3.0 KiB
3.0 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 03-hook-server | 02 | daemon |
|
|
|
|
|
|
|
|
|
3min | 2026-03-23 |
Phase 03 Plan 02: Hook Server Integration Summary
Hook server HTTP integre au daemon avec graceful degradation, poll dynamique 20s/5s, et affichage WaitType dans vmux list
Performance
- Duration: 3 min
- Started: 2026-03-23T18:43:39Z
- Completed: 2026-03-23T18:47:04Z
- Tasks: 2
- Files modified: 5
Accomplishments
- Hook server HTTP demarre avec le daemon, se ferme proprement au Stop
- Si le port 3119 est occupe, le daemon continue sans hooks (log warning)
- Poll interval passe de 5s a 20s quand hooks actifs (dernier hook < 60s)
- WaitType affiche dans
vmux list:[Needs Input: permission],[Needs Input: question]
Task Commits
Each task was committed atomically:
- Task 1: Hook server dans Daemon -
5f13eb1(test) +79ad8fb(feat) - Task 2: Affichage WaitType -
e605249(test) +9cf0480(feat)
TDD: each task has RED (test) + GREEN (feat) commits
Files Created/Modified
daemon.go- hookPort, httpServer, lastHookTime, startHookServer, currentPollInterval, dynamic pollLoopdaemon_test.go- 4 nouveaux tests hook server + poll slowdownhook.go- lastHookTime tracking dans processHookEventdisplay.go- Affichage WaitType conditionnel dans DisplaySessionInfosdisplay_test.go- 4 nouveaux tests WaitType display
Decisions Made
- hookPort=0 dans newTestDaemon pour eviter les binds accidentels dans les tests existants
- time.After(d.currentPollInterval()) remplace le ticker fixe pour adapter dynamiquement
Deviations from Plan
None - plan executed exactly as written.
Issues Encountered
None
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- Hook server completement integre, pret pour Phase 04 (notifications)
- Le WaitType est disponible dans l'IPC pour les clients
Self-Check: PASSED
All 5 files found. All 4 commits verified. All 12 acceptance criteria met.
Phase: 03-hook-server Completed: 2026-03-23